Tripod Torch of Phase 13A in South Pars Installed
Tripod Torch of Phase 13A in South Pars Installed
TEHRAN - The operator of Phase 13 of the South Pars gas field says the operation for installing the tripod torch for Platform A of Phase 13 in South Pars gas bloc in Persian Gulf was completed.

Mr. Payam Motamed said the operation for installing the structure as the last tripod torch of Phase 13 platforms as well as its related deck was carried out in 10 days by sea pad and it ended on Friday.

IRAN NEWS ECONOMIC DESK

He went on to say that the tripod torch was manufactured at Iran Marine Industrial Company’s (SADRA) in Bushehr, adding that the tripod torch was manufactured in 405 tons weight with 65 meters height. He added that the structure was lifted with the help of a floating crane HL-5000 and is being moved to its location with Mahdis barge.

Motamed went on to say that when the Platform 13A of the project becomes operational, the gas extraction capacity of the country will be boosted by 14.2m cubic meters per day.