<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Joint Gas Field Archives - Iran News Daily</title>
	<atom:link href="https://irannewsdaily.com/tag/joint-gas-field/feed/" rel="self" type="application/rss+xml" />
	<link>https://irannewsdaily.com/tag/joint-gas-field/</link>
	<description></description>
	<lastBuildDate>Tue, 16 Jul 2019 08:17:43 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.6.4</generator>

<image>
	<url>https://irannewsdaily.com/wp-content/uploads/2020/04/cropped-iranlogo-32x32.png</url>
	<title>Joint Gas Field Archives - Iran News Daily</title>
	<link>https://irannewsdaily.com/tag/joint-gas-field/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>South Pars 14 offshore sector to come online in Sep.</title>
		<link>https://irannewsdaily.com/2019/07/south-pars-14-offshore-sector-to-come-online-in-sep/</link>
					<comments>https://irannewsdaily.com/2019/07/south-pars-14-offshore-sector-to-come-online-in-sep/#respond</comments>
		
		<dc:creator><![CDATA[reporter 1222]]></dc:creator>
		<pubDate>Tue, 16 Jul 2019 09:11:12 +0000</pubDate>
				<category><![CDATA[economic]]></category>
		<category><![CDATA[Gas Production]]></category>
		<category><![CDATA[Joint Gas Field]]></category>
		<category><![CDATA[South Pars]]></category>
		<guid isPermaLink="false">https://irannewsdaily.com/?p=96070</guid>

					<description><![CDATA[<p>Currently, the two platforms of SP14 are producing 28 mcm/d of gas. The third platform of this phase was loaded out in Bandar Abbas recently and moved to its location at 14B. Speaking to Iran Petroleum, Mohammad Mehdi Tavasolipour, manager of SP14 project, said the chain of the offshore sector of this project would be [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://irannewsdaily.com/2019/07/south-pars-14-offshore-sector-to-come-online-in-sep/">South Pars 14 offshore sector to come online in Sep.</a> appeared first on <a rel="nofollow" href="https://irannewsdaily.com">Iran News Daily</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Currently, the two platforms of SP14 are producing 28 mcm/d of gas. The third platform of this phase was loaded out in Bandar Abbas recently and moved to its location at 14B.</p>
<p>Speaking to Iran Petroleum, Mohammad Mehdi Tavasolipour, manager of SP14 project, said the chain of the offshore sector of this project would be completed before winter. That would bring gas recovery from SP14 to 56 mcm/d. The first gas train of this project is also coming online this year.</p>
<p>Installation and launch of a platform takes between 30 and 45 days. Therefore, gas recovery from this platform would be possible at the rate of 14 mcm/d in September, he said.</p>
<p>According to the project manager, platform 14D, a satellite platform and the last platform at SP14, is in the final phase of construction. It will be installed in October. &#8220;It shows that before the arrival of winter, 14 mcm/d of gas would be recovered from this platform and the chain for the recovery of 56 mcm/d of rich gas, mainly in its offshore sector, will be completed.&#8221;</p>
<p>&#8220;Since the onshore refinery of this phase is not complete yet, the gas recovered from these platforms was delivered to the refinery of SP12 via a pipeline connecting SP12 and SP14. By using the untapped capacity of this phase, processing and sweetening operations will be carried out,&#8221; he added.</p>
<p>The contract for SP14 development was struck in June 2010 between the National Iranian Oil Company and eight contractors.</p>
<p>According to Mohammad Meshkinfam, CEO of Pars Oil and Gas Company, 60 mcm/d would be added to the South Pars gas production capacity this year. Therefore, gas production capacity in the South Pars gas field would reach 600 mcm/d by next March.</p>
<p>The post <a rel="nofollow" href="https://irannewsdaily.com/2019/07/south-pars-14-offshore-sector-to-come-online-in-sep/">South Pars 14 offshore sector to come online in Sep.</a> appeared first on <a rel="nofollow" href="https://irannewsdaily.com">Iran News Daily</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://irannewsdaily.com/2019/07/south-pars-14-offshore-sector-to-come-online-in-sep/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>2,400-ton superstructure offshore platform installed in Phase 14-B of South Pars Gas Field</title>
		<link>https://irannewsdaily.com/2019/07/2400-ton-superstructure-offshore-platform-installed-in-phase-14-b-of-south-pars-gas-field/</link>
					<comments>https://irannewsdaily.com/2019/07/2400-ton-superstructure-offshore-platform-installed-in-phase-14-b-of-south-pars-gas-field/#respond</comments>
		
		<dc:creator><![CDATA[reporter 1222]]></dc:creator>
		<pubDate>Sat, 13 Jul 2019 13:07:45 +0000</pubDate>
				<category><![CDATA[economic]]></category>
		<category><![CDATA[Joint Gas Field]]></category>
		<category><![CDATA[South Pars ISOICO]]></category>
		<guid isPermaLink="false">https://irannewsdaily.com/?p=95882</guid>

					<description><![CDATA[<p>The third offshore platform of Phase 14-B of South Pars Gas Field, which was designed and manufactured at the initiation of domestic engineers and experts and launched to water on June 11, installed in Bandar Abbas on Saturday. Upon the installation of this giant offshore platform, 500 million cubic feet of gas, equivalent to 14.2 [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://irannewsdaily.com/2019/07/2400-ton-superstructure-offshore-platform-installed-in-phase-14-b-of-south-pars-gas-field/">2,400-ton superstructure offshore platform installed in Phase 14-B of South Pars Gas Field</a> appeared first on <a rel="nofollow" href="https://irannewsdaily.com">Iran News Daily</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The third offshore platform of Phase 14-B of South Pars Gas Field, which was designed and manufactured at the initiation of domestic engineers and experts and launched to water on June 11, installed in Bandar Abbas on Saturday.</p>
<p>Upon the installation of this giant offshore platform, 500 million cubic feet of gas, equivalent to 14.2 million cubic meters/day, will be added to the gas production capacity of South Pars Joint Gas Field.</p>
<p>In this regard, two gas platforms, each with the daily production capacity of 500 million cubic meters (equivalent to 14.2 million cubic meters), became operational last year (ended March 20, 2019), so that the gas produced from these two platforms is transferred to the national gas grid in one of refineries in Kangan area.</p>
<p>The gas platform No. 14-B in South Pars Gas Field is as weigh as 2,400 tons which was launched to water from industrial yard of Iran Shipbuilding &amp; Offshore Industries Complex (ISOICO) in Bandar Abbas on June 11.</p>
<p>The most interesting point is this that all stage of supplying parts, constructing, loading, transferring, installing and commissioning of these giant platforms have been carried out by expert domestic engineers.</p>
<p>The post <a rel="nofollow" href="https://irannewsdaily.com/2019/07/2400-ton-superstructure-offshore-platform-installed-in-phase-14-b-of-south-pars-gas-field/">2,400-ton superstructure offshore platform installed in Phase 14-B of South Pars Gas Field</a> appeared first on <a rel="nofollow" href="https://irannewsdaily.com">Iran News Daily</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://irannewsdaily.com/2019/07/2400-ton-superstructure-offshore-platform-installed-in-phase-14-b-of-south-pars-gas-field/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
